You must be a CVU Member to view this resource.
Dongbu Finance Building
Dongbu Kangnam Tower, Dongbu Securities Building
Building
Completed
2001
Office
158.3 m / 519 ft
35
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
10 October 2004
Joong C. Lee & Gregory Freeman, Weidlinger Associates
The Dongbu Securities Headquarters Building in Daichi-Dong, Seoul is a dynamic interplay of interlocked, canted forms that fold into each other in a response to...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development