You must be a CVU Member to view this resource.
CITIC Tower
China Zun, Zhongguo Zun
Building
Completed
2018
Office
Concrete-Steel Composite
LEED-CS Gold Precertification, China Certificate of Green Building Label-Three Star
527.7 m / 1,731 ft
109
8
637
101
10 m/s
350,000 m² / 3,767,369 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2019 CVU Awards
2021 CVU Awards
2021 CVU Awards
2019 CVU Awards
CITIC Tower will be the flagship building of Beijing’s comprehensively planned 30-hectare central business district core.
The tower’s gently rising and curving form resembles an ancient Chinese ceremonial vessel, called the “zun.” The design concept is that of a transforming shell that gradually bends to create a dramatic form. This concept is also applied to other key elements of the tower, including the entrances, ground-floor lobby, and observation deck. At the base, the tower thrusts into the ground with massive corner supports, while the exterior shell is gently lifted up and stretched forward at the four sides. The design physically extends the lobby outward, forming dynamic drop-off spaces. At the top, the exterior envelope becomes more transparent at the observation deck and allows more visibility to the inner trumpet-shaped business center, which lights up at night, forming a beacon that will be visible throughout the city.
Compared to a typically straight or tapering supertall tower form, the concave tower profile offers more valuable prime-floor spaces and ample space for window washing, as well as other support systems, at the top of the tower. While the large top poses significant structural challenges, the larger base provides an opportunity for structural balance, formal contrast, and preferred core-to-perimeter distances.
In a city with the highest seismic fortification requirement of the major cities in China, the structural system was particularly sensitive to adjustments in the complex form of the building. Architects and engineers utilized parametric modeling to greatly expedite the design and coordination process to ensure that the design achieved both an iconic form and a solid structural system.
2019 CVU Awards
2021 CVU Awards
2021 CVU Awards
2019 CVU Awards
2021 CVU Awards
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development