Filter by
Mark D’Amato and Guy Conversano founded DCI in 1988, beginning the adventure out of one of their basements. From the start, they were committed to creating the kind of environment that would enable employees to thrive and make clients want to come back. That same tradition of commitment to our clients and employees alike continues to fuel the leadership of today.
DCI has long been on the leading edge when it comes to industry technology, but for us, technology is more than just new gadgets: it’s combining the promise of these new tools with our history of innovative ideas to save our clients money.
DCI is based in Seattle, with offices in Spokane, Portland, San Diego, Austin, Irvine, San Francisco, and Anchorage. We are licensed in all 50 states and most Canadian provinces.
Seismic Design; Structural Engineering
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
---|---|---|---|
1 | The Independent | 211.4 m / 694 ft | |
2 | ELEV8 Office | 182.9 m / 600 ft | |
3 | Madison Centre | 170.7 m / 560 ft | |
4 | 1918 8th Avenue | 152.4 m / 500 ft | |
5 | ELEV8 Apartments | 140.2 m / 460 ft | |
6 | ELEV8 Condominum | 140.2 m / 460 ft | |
7 | ELEV8 Hotel | 140.2 m / 460 ft | |
8 | 1800 Terry | 134.1 m / 440 ft | |
9 | The 8 Tower | 132.3 m / 434 ft | |
10 | Fifteen Fifty | 128.6 m / 422 ft |
CTBUH Seattle Chapter, 2018 – Present
CTBUH Steel-Timber Research Project Steering Committee, 2022 – Present
23 May 2022
Three Projects, Three Levels Of Steel-Timber Hybrid Complexity
Case studies include Bullitt Center, Seattle, using steel BRB diagonal frames; Skylight, Portland, using GLT post-and-beam construction with steel tensioners and secondary frame; and 1...
23 May 2022
Interactive Study - The State of Tall Timber: A Global Audit
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
12 December 2019
Interactive Study on Year in Review: Tall Trends of 2019
The year 2019 was remarkable for the tall building industry, with 26 supertall buildings (300 meters or taller) completed, the most in any year. This...
RANK
|
Name
|
Completion
|
Height
|
Floors
|
Function
|
|
---|---|---|---|---|---|---|
1 | The Independent | Austin | 2019 |
211 m / 694 ft |
58 | Residential |
2 | ELEV8 Office | Bellevue | - |
183 m / 600 ft |
40 | Office |
3 | Madison Centre | Seattle | 2017 |
171 m / 560 ft |
36 | Office |
4 | 1918 8th Avenue | Seattle | 2009 |
152 m / 500 ft |
37 | Office / Retail |
5 | ELEV8 Apartments | Bellevue | - |
140 m / 460 ft |
42 | Residential |
5 | ELEV8 Condominum | Bellevue | - |
140 m / 460 ft |
42 | Residential |
7 | ELEV8 Hotel | Bellevue | - |
140 m / 460 ft |
40 | Hotel |
8 | 1800 Terry | Seattle | - |
134 m / 440 ft |
38 | Residential |
9 | The 8 Tower | Seattle | 2023 |
132 m / 434 ft |
42 | Residential |
10 | Fifteen Fifty | San Francisco | 2020 |
129 m / 422 ft |
37 | Residential / Office |
11 | 1500 Mission Street | San Francisco | 2020 |
121 m / 396 ft |
39 | Residential |
12 | 1101 8th Avenue Tower 1 | Seattle | 2022 |
105 m / 345 ft |
31 | Residential |
12 | 1101 8th Avenue Tower 2 | Seattle | 2022 |
105 m / 345 ft |
31 | Residential |
14 | Cielo | Seattle | 2015 |
102 m / 335 ft |
32 | Residential |
15 | Waterloo Tower | Austin | 2022 |
98 m / 320 ft |
30 | Residential |
16 | MIRO East Tower | San Jose | 2021 |
91 m / 298 ft |
28 | Residential |
16 | MIRO West Tower | San Jose | 2021 |
91 m / 298 ft |
28 | Residential |
18 | San Francisco Planning, Building and Public Works Departments | San Francisco | 2020 |
73 m / 238 ft |
16 | Office |
19 | 818 Stewart | Seattle | 2008 |
67 m / 220 ft |
14 | Office |
20 | Four50 | Chicago | 2020 |
57 m / 187 ft |
18 | Residential |
21 | Residence Inn Grand Rapids | Grand Rapids | 2020 |
49 m / 162 ft |
13 | Hotel |
22 | Emmons on 3rd | Seattle | 2014 |
26 m / 86 ft |
8 | Residential |
23 | Heartwood | Seattle | - |
25 m / 83 ft |
8 | Residential |
24 | India & Beech | San Diego | - |
- |
30 | Residential |
25 | 259 West Riverside Avenue | Spokane | - |
- |
14 | Residential / Retail |
Average Building Age*
10 Years
Most Common Function*
Residential (33%)
Most Common Material*
Concrete (50%)
* Based on 150 m+ buildings currently in the database
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
CTBUH Steel-Timber Research Project Steering Committee, 2022 – Present
23 May 2022
Case studies include Bullitt Center, Seattle, using steel BRB diagonal frames; Skylight, Portland, using GLT post-and-beam construction with steel tensioners and secondary frame; and 1...
23 May 2022
Heartwood is a 126-unit workforce housing project, one of the first Type IV-C 8-story mass timber/steel hybrid and is currently under construction in Seattle, WA....
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
12 December 2019
CTBUH Research
The year 2019 was remarkable for the tall building industry, with 26 supertall buildings (300 meters or taller) completed, the most in any year. This...
18 April 2017
The annual CTBUH Seattle Spring Forum featured a panel discussion examining and interpreting the impact of Seattle’s "HALA" on future downtown development.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development