|
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
|---|---|---|---|
| 1 | The Wedge | 49.7 m / 163 ft | |
| 2 | Tallwood 1 at District 56 | 41.7 m / 137 ft |
23 May 2022
Cast Steel Connections in Steel Timber Hybrid Construction
Case studies: Vancouver International Airport: custom and standardized cast connectors for timber columns; University of Victoria: custom castings mate timber columns with steel cantilevered beams...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development