You must be a CVU Member to view this resource.
Westendstrasse 1
Hochhaus der DG Bank
Building
Completed
1993
Office
All-Concrete
208 m / 682 ft
53
3
25
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
21 October 2010 | Frankfurt am Main
William Pedersen, Partner, Kohn Pedersen Fox Associates. Mr. Pedersen’s approach to design has been one that weds formal and technical originality with a modesty informed...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development