Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Guizhou Culture Plaza Tower
Guizhou Cultural Plaza Orchid Tower, The Future Ark
Building
Proposed
Hotel / Office
Composite
521 m / 1,709 ft
109
6
400
4500
63
9 m/s
290,000 m² / 3,121,534 ft²
Proposed
Construction Start
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
27 October 2015 | Guiyang
A series of challenging site constraints prompted an innovative structural solution for the Guizhou Culture Plaza Tower (GCP), through which a new performance-based expression was...
26 October 2015
Yuping Luo, Zhongtian Urban Development Group Co., Ltd; Charles Besjak, Daniel Cashen & Colin Koop, Skidmore, Owings & Merrill
A series of challenging site constraints prompted an innovative structural solution for the Guizhou Culture Plaza Tower (GCP), through which a new performance-based expression was...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development