You must be a CVU Member to view this resource.
Equitable Building
Building
Completed
1965
Office
All-Steel
LEED Gold
139.3 m / 457 ft
35
92,400 m² / 994,585 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
26 October 2015
Michael F. Kaufman, Goettsch Partners
GP was selected to Renovate or Adapt “The” prime corners of Michigan Avenue on both sides of the Chicago River, all within a two year...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development