You must be a CVU Member to view this resource.
York Centre
Building
Completed
1973
Office
BOMA BESt: Level 2; LEED Gold O+M: Existing Buildings
110 m / 361 ft
23
3
228
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development