You must be a CVU Member to view this resource.
Vanke One City Office Tower
Building
Completed
2019
Office / Hotel / Retail
All-Concrete
220 m / 722 ft
51
300
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
12 December 2019
CTBUH Research
The year 2019 was remarkable for the tall building industry, with 26 supertall buildings (300 meters or taller) completed, the most in any year. This...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development