This project is a renovation and replaced Plaza Villa Madrid 1
You must be a CVU Member to view this resource.
Torre Glorieta Cibeles
Building
Completed
2021
Office
Composite
LEED Platinum targeted
74 m / 243 ft
18
2
10,800 m² / 116,250 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development