You must be a CVU Member to view this resource.
Torre del Ángel
Building
Completed
Office
72.3 m / 237 ft
21
4
You must be a CVU Member to view this resource.
Construction Start
Retrofit Start
Retrofit End
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development