You must be a CVU Member to view this resource.
The Landmark Gloucester Tower
Building
Completed
1980
Office
All-Concrete
159.4 m / 523 ft
46
2
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
16 September 2014
James Robinson, Hongkong Land
Hongkong Land was instrumental in developing Hong Kong’s famous network of skybridges between buildings. CTBUH Editor Daniel Safarik spoke to James Robinson, Executive Director of...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development