You must be a CVU Member to view this resource.
The Hundred
Farpoint Mega Kuningan
Building
On Hold
Residential / Office / Hotel
LEED Gold
212 m / 696 ft
47
111,372 m² / 1,198,798 ft²
Proposed
Construction Start
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development