Filter by
You must be a CVU Member to view this resource.
T30 Hotel
T30 Tower Hotel
Building
Completed
2012
Hotel
All-Steel
99.9 m / 328 ft
30
1
330
65
3
2.5 m/s
17,338 m² / 186,625 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
03 July 2014 | Changsha
Time lapse of T30 Hotel being constructed in just 15 days.
03 July 2014 | Changsha
Time lapse of T30 Hotel being constructed in just 15 days.
07 November 2013 | Changsha
Shuguang Wang discusses the Broad Sustainable Building Prefabricated Construction Method, a Tall Building Innovation Award Co-Winner. He talks about the innovative new pre-fabrication technology and...
07 November 2013 | Changsha
Never before has an entire prefabricated building system been developed to this degree. The BSB Method is a clear and innovative way of fundamentally rethinking...
21 September 2012 | Changsha
Ying Tang of Broad Sustainable Building is interviewed by Jeff Herzer during the 2012 CTBUH Shanghai Congress at the Jin Mao, Shanghai. Ying Tang discusses...
21 September 2012 | Changsha
Andy Davids of Hyder Consulting is interviewed by Jeff Herzer during the 2012 CTBUH Shanghai Congress at the Jin Mao, Shanghai. Andy discusses the 838-meter...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development