You must be a CVU Member to view this resource.
Shiodome Sumitomo Building
Building
Completed
2004
Hotel
All-Steel
126.4 m / 415 ft
25
3
240
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
30 April 2018
Elena Mele, Diana Faiella, University of Naples Federico II
Inter-story isolation systems (IIS) are currently gaining significant popularity, mainly in Japan, where more than 60 applications have been realized in the past 20 years....
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development