You must be a CVU Member to view this resource.
Shenzhen Bay Innovation and Technology Centre Tower 1
Building
Completed
2020
Office
Concrete-Steel Composite
311.1 m / 1,021 ft
69
4
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
12 January 2021
CTBUH Research
The Council on Tall Buildings and Urban Habitat has released its annual report, CTBUH Year in Review: Tall Trends of 2020, part of the Tall...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development