You must be a CVU Member to view this resource.
Sara Kulturhus
Kulturhus Skellefteå
Building
Completed
2021
Hotel / Exhibition
Steel-Timber Composite
72.8 m / 239 ft
20
1
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The lower part of Sara Kulturhus consists of prefabricated wood reinforced with concrete slabs and a blend between glulam beams and steel construction.
The rest of the tower tower is built of prefabricated wooden modules, placed between cross-glued wooden lift cores.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development