You must be a CVU Member to view this resource.
Rainier Tower
Beaver Building, Rainier Bank, Security Pacific Bank, Rainier Square
Building
Completed
1977
Office
All-Steel
156.7 m / 514 ft
31
2
12
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
11 October 2011 | Seattle
Integrating and even celebrating the structure of a building through the architectural design often leads to dramatic and memorable buildings. To achieve the best outcome...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development