You must be a CVU Member to view this resource.
Premier on Pine
Building
Completed
2015
Residential
All-Concrete
LEED Silver
135.3 m / 444 ft
39
386
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development