You must be a CVU Member to view this resource.
Place Ville Marie
Building
Completed
1962
Office
All-Steel
188 m / 617 ft
43
32
95,922 m² / 1,032,496 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
07 November 2013 | Montreal
Lynn S. Beedle Lifetime Achievement Awardee Henry Cobb's career is remarkable because of his ethical and forward-thinking approach to the design of tall buildings and...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development