You must be a CVU Member to view this resource.
Pearl of the Orient Tower
Building
Completed
2004
Residential
All-Concrete
168 m / 551 ft
42
4
6
125,500 m² / 1,350,871 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development