You must be a CVU Member to view this resource.
Oasis Beach Tower
Building
Completed
2006
Residential
All-Concrete
245 m / 804 ft
51
9
4 m/s
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
31 December 2006
Nina Tower 1 in Hong Kong, at 319 meters high, leads the list of the ten tallest buildings completed in 2006. The Sports City Tower/Aspire...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development