You must be a CVU Member to view this resource.
Monenco Place
Building
Completed
1983
Office
All-Concrete
115 m / 377 ft
28
38,040 m² / 409,459 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development