You must be a CVU Member to view this resource.
Metro Tower
Elite Tower 9
Building
Never Completed
Residential / Office
All-Concrete
250 m / 820 ft
53
62,709 m² / 674,994 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development