You must be a CVU Member to view this resource.
Marquette Place
Building
Completed
1985
Residential
All-Concrete
99.8 m / 327 ft
36
41,806 m² / 449,996 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development