You must be a CVU Member to view this resource.
KölnTriangle
Horion, Triangle Tower, LVR-Turm, Rheinische Zusatzversorgungskasse, RZVK Hochhaus
Building
Completed
2005
Office
103.2 m / 339 ft
29
65,000 m² / 699,654 ft²
You must be a CVU Member to view this resource.
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development