You must be a CVU Member to view this resource.
James R. Thompson Center
Thompson Center, State of Illinois Building
Building
Completed
1985
Office
All-Steel
93.9 m / 308 ft
17
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Retrofit Start
Retrofit End
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
28 April 2017
Helmut Jahn, JAHN; Mir Ali, University of Illinois at Urbana-Champaign
Chicago’s drum-shaped, 17-story James R. Thompson Center, with its soaring atrium and extensive glazing, has been criticized for poor temperature control and spatial inefficiency, and...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development