This project was redesigned in 2020 and replaced by Alveo Financial Tower
You must be a CVU Member to view this resource.
JAKA Tower
Building
Never Completed
Office
All-Concrete
185.9 m / 610 ft
49
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development