You must be a CVU Member to view this resource.
Islamic Development Bank Headquarters
Building
Completed
1993
Office
107 m / 351 ft
22
3
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
08 August 2017
Noura Ghabra & Dr. Lucelia Rodrigues, University of Nottingham; Dr. Philip Oldfield, The University of New South Wales
Energy consumption in Gulf Cooperation Council (GCC) countries has been rising over the last four decades. The residential building sector alone accounts for more than...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development