International House South
Building
Completed
2017
Office / Retail
Timber Over Concrete
6 Star Green Star Design and 5 Star-plus NABERS rating
30 m / 98 ft
7
7,900 m² / 85,035 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
04 April 2022
Lisa Thom, Lendlease
As the tall building industry increasingly becomes interested in using engineered mass timber to construct high-rise buildings, the economical and construction-efficiency advantages need to be...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development