You must be a CVU Member to view this resource.
Gran Hotel Bali
Hotel Bali III, Torre Bali 3, Gran Hotel, Marina Palais
Building
Completed
2002
Hotel
All-Concrete
186 m / 610 ft
52
438
18
41,170 m² / 443,150 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development