This project was renovated in 2012 and replaced by Torre Garibaldi A
Ferrovie dello Stato 1
F. S. Tower 1, State Railways Administration Tower 1
Building
Completed
1992
Office
Concrete Over Steel
122 m / 400 ft
28
145
8
23,751 m² / 255,654 ft²
Proposed
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development