You must be a CVU Member to view this resource.
EVN River Pearls
Building
Vision
8-8 Bis Ham Tu, Ward 8, District 3
Residential / Retail
All-Concrete
135 m / 443 ft
33
3
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development