You must be a CVU Member to view this resource.
Equitable Building
Building
Completed
1971
Office
82.9 m / 272 ft
22
1
39,356 m² / 423,624 ft²
You must be a CVU Member to view this resource.
Construction Start
Completed
Recladding
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development