You must be a CVU Member to view this resource.
Deutsche Bank
130 Liberty Street, Bankers Trust Plaza
Building
Demolished
1974
Office
All-Steel
157.6 m / 517 ft
39
2
30
Completed
Demolished
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
27 April 2018
CTBUH Research
Although the world has more than 1,300 buildings of 200 meters or higher, no tall building of more than 187 meters has been demolished, with...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development