Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
CT-01 Complex project- Stage 3- Nam Thang Long Urban area Tower B
Tổ hợp công trình CT-01- Giai đoạn 3- Khu Đô thị Nam Thăng Long
Building
Proposed
Land lot CT-01 - Stage 3- Nam Thang Long Urban area - Tay Ho Dist. - Hanoi
Residential / Retail
Concrete Over Steel
86.5 m / 284 ft
21
1
180
4
Proposed
Construction Start
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development