You must be a CVU Member to view this resource.
Centralcon Group Tower
Building
Completed
2016
Office
Concrete-Steel Composite
200 m / 656 ft
43
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
05 March 2008 | Shenzhen
Stefan Krummeck, Terry Farrell & Partners examined the interconnection between tall buildings and urbanism at the CTBUH 8th World Congress in Dubai. Taking a look...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development