You must be a CVU Member to view this resource.
Cecil and Ida Green Center for Earth Sciences
Green Building, MIT Center for Earth Sciences
Building
Completed
1964
Education
All-Concrete
84.4 m / 277 ft
21
12,124 m² / 130,502 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development