You must be a CVU Member to view this resource.
Belfer Research Building
Weill Cornell Medical College
Building
Completed
2014
Hospital
All-Concrete
LEED Gold
91.4 m / 300 ft
18
9
3.56 m/s
46,410 m² / 499,553 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development