You must be a CVU Member to view this resource.
BASF Hochhaus E 100
Friedrich-Engelhorn-Haus, BASF Verwaltungsbau
Building
Demolished
1957
Other
All-Steel
102 m / 335 ft
22
22,396 m² / 241,069 ft²
Construction Start
Completed
Demolished
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development