You must be a CVU Member to view this resource.
AXA Tower
Singapore Treasury Building, Temasek Tower
Building
Under Demolition
1986
Office
Concrete-Steel Composite
234.7 m / 770 ft
52
5
667
22
130,063 m² / 1,399,986 ft²
Construction Start
Completed
Demolished
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development