You must be a CVU Member to view this resource.
Aufzugstestturm
TK Elevator Test Tower, thyssenkrupp Test Tower, Power Tower, Tower of Light
Tower
Completed
2017
Observation / Industrial
All-Concrete
246 m / 807 ft
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2022 CVU Awards
30 January 2020
Michael Cesarz, MULTI thyssenkrupp Elevator
The potential of ropeless elevators to change the way we experience urban space has been addressed by two research projects conducted by CTBUH and funded...
A collaborative design from architects Werner Sobek and Helmut Jahn, the Aufzugstestturm was inaugurated on Monday, December 12, 2016 and began testing high-speed elevators before the twisting facade was completed in the spring of 2017.
2022 CVU Awards
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development