Ascent
Building
Completed
2022
Residential
Concrete-Timber Composite Over Concrete
LEED Silver
86.6 m / 284 ft
25
259
335
3
45,708 m² / 491,997 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
01 October 2020 | Milwaukee
Toward a Factory Approach to Tall Timber Building Construction
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
04 April 2022
Hans-Erik Blomgren, Timberlab
In 2021, several major obstacles were overcome in the path to adoption of mass timber as a viable option for high-rise construction in North America....
04 April 2022
Daniel Safarik, Jacob Elbrecht & William Miranda, CTBUH
The past few years have seen tremendous interest in the development of mass timber buildings of increasing height, in urban settings, many of which are...
12 January 2021
Tim Gokhman, New Land Enterprises
As developers’ appetites for building tall with mass timber grows, acceptance of the technique is growing among approving authorities, which in turn, allows the height...
16 September 2020
Alejandro Fernandez, Jordan Komp, and John Peronto, Thornton Tomasett
Ascent, a 25 story residential tower located in Milwaukee, WI (USA), will become the tallest timber building in the world upon completion. This paper discusses...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development