You must be a CVU Member to view this resource.
Arora Tower
The Peninsula Tower
Building
Completed
2016
Residential
All-Concrete
86.7 m / 284 ft
24
100
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development