You must be a CVU Member to view this resource.
AC Hotel Barcelona
AC Hotel, Hotel AC Barcelona, AC Hotel Barcelona Forum
Building
Completed
2004
Hotel
All-Concrete
93.9 m / 308 ft
22
1
368
29,317 m² / 315,566 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development