You must be a CVU Member to view this resource.
900 Albert Tower 3
Building
Vision
Residential
All-Concrete
167.8 m / 550 ft
55
500
Proposed
Construction Start
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development