461 Dean
461 Dean Street, Brooklyn B2
Building
Completed
2016
Residential
All-Steel
109.4 m / 359 ft
32
2
363
4
32,164 m² / 346,210 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Proposed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2018 CVU Awards
31 May 2018 | New York City
461 Dean is the world’s tallest volumetric modular apartment building. Its success hinged on careful pre-planning of construction activities, as well as the introduction of...
08 August 2017
Ilkay Can-Standard, GenX Design & Technology; Martina Dolejsova, Studio Libeskind
ASPECT: RATIOS is the outgrowth of a program developed by the CTBUH Young Professionals Committee in New York, beginning in 2016. The purpose of the...
461 Dean Street is a residential development in the Pacific Park neighborhood of Brooklyn. 461 Dean Street is built with modular construction consisting of 930 steel modules. It has 363 rental apartments, 50 percent of the units will be affordable to low- and middle- income households, and has 4,000 square-feet delegated to retail at its base.
2018 CVU Awards
31 May 2018 | New York City
461 Dean is the world’s tallest volumetric modular apartment building. Its success hinged on careful pre-planning of construction activities, as well as the introduction of...
19 September 2012 | New York City
David Scott of Laing O'Rourke is interviewed by Jeff Herzer during the 2012 CTBUH Shanghai Congress at the Jin Mao, Shanghai. David talks about prefabrication...
08 August 2017
Ilkay Can-Standard, GenX Design & Technology; Martina Dolejsova, Studio Libeskind
ASPECT: RATIOS is the outgrowth of a program developed by the CTBUH Young Professionals Committee in New York, beginning in 2016. The purpose of the...
08 August 2017
Leading Women in Tall Buildings
Recently, there has been a growing and overdue recognition in the architecture discipline that women are under-represented, not just in terms of leadership positions held,...
20 April 2017
Roger Krulak, Full Stack Modular
In 2016, 461 Dean Street, the world’s tallest volumetric modular building, was completed in New York City (see Figure 1). As few such projects had...
26 October 2015
Elena Generalova & Viktor Generalov, Samara State University of Architecture and Civil Engineering
The paper proposes to reflect on the questions: what does the typology of apartments in contemporary high-rise construction mean and whether it is consistent with...
22 October 2015
New York 2015 Conference Special
To commemorate the CTBUH 2015 International Conference, some of the most prominent voices in the New York tall building industry today – all of whom...
31 December 2014
Daniel Safarik, Antony Wood, Marty Carver & Marshall Gerometta, CTBUH
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
16 September 2014
David Farnsworth, ARUP
The Atlantic Yards B2 Modular Residential Tower will be the tallest volumetric modular building in the world when completed in early 2015. In January 2011,...
14 September 2014
Daniel Safarik, CTBUH
The survival of humanity on this planet relies on a radical repositioning of our cities. In the face of unprecedented global population growth, urbanization, pollution...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development