You must be a CVU Member to view this resource.
225 Franklin Street
State Street Bank Building
Building
Completed
1966
Office
All-Steel
145.4 m / 477 ft
33
24
85,200 m² / 917,085 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development