You must be a CVU Member to view this resource.
212 South Meramec
The Crossing
Building
Completed
2017
Residential
All-Concrete
115.8 m / 380 ft
27
250
213
3
35,548 m² / 382,635 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development