You must be a CVU Member to view this resource.
120 Riverside Boulevard at Trump Place
Building
Completed
2004
Residential
All-Concrete
70.1 m / 230 ft
18
276
3
3.56 m/s
27,671 m² / 297,848 ft²
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development